Drawworks: Oil well 3000 powered by GE 752 Traction motors, Baylor Elmagco 7838 Brake. Mast 147 Ft. Pyramid with 750 ton WCI block, 1,500,000 pound pullback, 800,000 pound set back. Substructure: Pyramid 30x34x68 with 371/2 inch Rotary Table. Generators: 3 Caterpillar 3512B Engines with Kato Generators model #6p6-3150 600 Volt 1204 KW. All Gen sets have around 10,000 hours. Mud Pumps: 2 National oil well A1700 PT Pumps. Each powered by 2 D79 traction motors. 1 National Oil Well A1400 PT powered by 2 D79 traction motors. Mud Pits: 5 tank mud pit system with 5 Brandt king cobra shale shakers, mud gas separator, 2 500 barrell water tanks, Brandt vacuum VDG degasser, Swaco 3 cone degasser, Swaco 10 cone desilter, Swaco 12 cone desilter.